Vallejo's updated ordinance for accessory dwelling units (ADUs), such as backyard cottages and converted garages, took effect October 8, 2026, according to the city. It also covers junior ADUs (JADUs), smaller units inside single-family homes. The ordinance sets local rules and does not approve any individual project.
Permits and timelines
An application that meets the rules is reviewed without a discretionary public hearing. That means the city does not weigh it case by case.
- The city must tell applicants within 15 business days whether an application is complete.
- It generally must decide a complete application within 60 days, with specified exceptions.
Parking
Exemptions from parking requirements cover:
- ADUs of 500 square feet or less
- locations within a half-mile walk of qualifying transit
- certain conversions
Converting or removing parking for an ADU generally does not require replacing it.
Who can live there, and rentals
The ordinance does not require homeowners to live on site for an ADU. Owner occupancy may apply to a JADU that shares a bathroom with the main home.
ADUs and JADUs may be rented for terms longer than 30 consecutive days. They normally cannot be sold separately from the primary home.
Fees and design standards
New ADUs of at least 750 square feet may owe proportional impact fees, which are charges based on the size of the new unit. Some newly built ADUs above 800 square feet must meet local design standards.
What the update does not do
Building permits, code compliance and property-specific limits still apply. The update mainly aligns local rules with California law, so not every exemption is new.
Before you start
Before designing a project, read the adopted ordinance and talk with Vallejo's Planning and Building divisions.
A one-day date difference
The city's project page says the ordinance was adopted September 9. The signed ordinance certifies September 8. That one-day difference is unresolved.
How we know (3 sources)
Dated source evidence; the project may have changed since then. An approval does not establish construction or an opening.
Supporting source
City status page reports an October 8 effective date and September 9 adoption, one day different from the signed clerk certificate.
ADU Ordinance UpdateCity of Vallejo · Project Status
Evidence dated: Date not stated · Source checked: Oct 12, 2026
Date discrepancy retained; city effectiveness stated as attributed official account.
Supporting source
Ordinance 1890 replaces Chapter 16.303; 15-business-day completeness and 60-day decision deadlines, ministerial permitting, parking and owner-occupancy exemptions, rental and resale limits, impact fees and design thresholds.
Ordinance No. 1890 N.C.(2d): Accessory Dwelling UnitsCity Council and City Clerk, City of Vallejo · Sections 16.303.03–16.303.09, pages 5–9; effective date page 15; adoption page 16
Evidence dated: Sep 8, 2026 · Source checked: Oct 12, 2026
Owner-authorized read of enacted ordinance on October 12, 2026; explains local standards without claiming newly created state rights.
Summary
Vallejo's updated ordinance for accessory dwelling units (ADUs), such as backyard cottages and converted garages, took effect October 8, 2026, according to the city. It also covers junior ADUs (JADUs), smaller units inside single-family homes. The ordinance sets local rules and does not approve any individual project.
## Permits and timelines
An application that meets the rules is reviewed without a discretionary public hearing. That means the city does not weigh it case by case.
- The city must tell applicants within 15 business days whether an application is complete.
- It generally must decide a complete application within 60 days, with specified exceptions.
## Parking
Exemptions from parking requirements cover:
- ADUs of 500 square feet or less
- locations within a half-mile walk of qualifying transit
- certain conversions
Converting or removing parking for an ADU generally does not require replacing it.
## Who can live there, and rentals
The ordinance does not require homeowners to live on site for an ADU. Owner occupancy may apply to a JADU that shares a bathroom with the main home.
ADUs and JADUs may be rented for terms longer than 30 consecutive days. They normally cannot be sold separately from the primary home.
## Fees and design standards
New ADUs of at least 750 square feet may owe proportional impact fees, which are charges based on the size of the new unit. Some newly built ADUs above 800 square feet must meet local design standards.
## What the update does not do
Building permits, code compliance and property-specific limits still apply. The update mainly aligns local rules with California law, so not every exemption is new.
## Before you start
Before designing a project, read the adopted ordinance and talk with Vallejo's Planning and Building divisions.
## A one-day date difference
The city's project page says the ordinance was adopted September 9. The signed ordinance certifies September 8. That one-day difference is unresolved.
Ordinance No. 1890 N.C.(2d): Accessory Dwelling UnitsCity Council and City Clerk, City of Vallejo · Sections 16.303.03–16.303.09, pages 5–9; effective date page 15; adoption page 16
Evidence dated: Sep 8, 2026 · Source checked: Oct 12, 2026
Owner-authorized agent editorial review (issue #120). The story was reorganized into sections and plain-language wording from the previously reviewed sources; no new facts were added beyond general definitions of terms.